<div dir="ltr">Hey folks,<div><br></div><div>I just had an issue where a pre-release succeeded, but the ultimate release failed to build. It's a repo containing multiple packages, and the fault came down to the fact that a prerelease checks out the whole repo and builds it as one workspace, whereas a release builds each package in total isolation.</div>

<div><br></div><div>Is there any way to make the prerelease a closer match to the actual release, so that the prerelease check a better predictor of release success?</div><div><br></div><div>Mike</div></div>